Meng 1/35 AH 64D Apache Part 6

0:00 We start with the TADS and pre-paint some parts to make it easier. 10:59 Next we install the gear and fit the Wire strike protection system (WSPS) And then build the 30mm gun. 25:56 Then we move onto the tail wheel and the stabilizer fitting the Photo Etch in place.

Phil Flory